2013年7月15日星期一

Adjustment of large hierarchical implementation of recreational facilities

(A) the design of the new large-scale recreational facilities, design unit should be based on the provisions in Annex 1 classification device-level design file explicitly, inspection agencies in the design documents when identifying or type test approval. Manufacturing units approved design documents should be marked on the equipment nameplate level, inspection agencies inspection be checked.
(Two) has completed the design documents for identification or type testing of large-scale recreational facilities, amusement park manufacturing units produced again, it should be graded according to the provisions of Annex 1 on the nameplate on the device level, by the inspection agency approved when the inspection.
(Three) in a large-scale amusement facilities, grading parameter adjustments occur due to changes in the level, the original equipment inspection agency shall inspect archives (previous copies of inspection reports, etc.) transferred to a new level determined by inspection agencies, and timely transfer notify in writing the use of units and the use of equipment registration department. Handover procedures, by the inspection body responsible for implementing the new periodic inspection.
(Four) before adjustments in classification, has made large-scale amusement facilities manufacture, installation license units, the original license eligibility unchanged; rides on the new application of large manufacturing license, manufacturing license or manufacturing license by item the replacement unit, according to Annex a grading permit implementation of the requirement.

没有评论:

发表评论